The much awaited powerglide transmission is in along with the bellhousing and shifter. Work started immediately upon having all necessary parts in hand. We’ve got the interior gutted in preparation for some rewiring and a fresh look inside. The engine bay is looking amazing thanks to Zach’s paint work.
